Clients
MPS Global in Colombia
Overview:
- 460 16” joints assembled using two assembly machines in one 7 hour shift
- Three net months finished opposed to eighteen month welding schedule




MPS Global in Russia
Overview:
- 12” Internally Coated Prepped Pipe
- Three months to completion
- Sure Lock proved to be a minimum of 5x faster than welding and as much as 10x faster
- Over 50% more cost effective than welding
- Less time, less cost, no sleeves, less diesel, no x-ray (which saves up to 10% of project costs)
- 12” Internally Coated Prepped Pipe
- Three months to completion
- Sure Lock proved to be a minimum of 5x faster than welding and as much as 10x faster
- Over 50% more cost effective than welding
- Less time, less cost, no sleeves, less diesel, no x-ray (which saves up to 10% of project costs)
MPS Global in Bahrain
Overview:
- 100km 3” and 4” gathering line system project completed 2010
- Client was Tatweer in a joint venture with Occidental Petroleum.

Testimonials
Technology

Sure Lock Pipe Prepping
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Sure Lock Field Assembly
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Sure Lock Epoxy Seal
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.